Arc Flash Analysis
Major Petroleum Refinery System Analysis, and Arc Flash Exposure Calculations. System modeling, data gathering, calculations, printing and installation of warning labels with PPE recommendation. Work completed includes extensive protective device coordination recommendations to favor operations while reducing arc flash exposure. Recommendations, training, labeling and detailed reports provided.
Switchgear Replacement
Technical Advisor for Major Petroleum Refinery main substation 13.8kV switchgear replacement project including 20 section two-high metal clad gear. Work includes switchgear and relay specification, system protection strategy, project construction management and coordination of refinery operating requirements.
Outage Analysis
Several projects completed for Major Petroleum Refinery including technical analysis of 13.8kV distribution outages and substation protective device coordination.
Power Distribution
Technical Advisor for Major Petroleum Refinery power distribution and lighting in support of new central control room, including 13.8kV feeders, substation, emergency power site and building lighting.
Operations Troubleshooting
Several projects completed for Major Petroleum Refinery to enhance power distribution reliability including recommendations for UPS maintenance and battery replacement, 480V circuit breaker coordination, emergency generator testing, alarm wiring, replacement part recommendations, relay configuration.
700HP VFD
Water district 700hp variable speed drive. Design included
medium voltage to 480V step down drive isolation
transformer, harmonics filter, variable frequency drive,
motor, protective fusing and contactor ratings.
Sulphuric Acid Plant MCCs
Four separate projects to replace existing Chemical Plant
Motor Control Centers (MCCs). Work includes design, planning
and cost estimates for 480V MCCs, including tie switches,
building expansion, etc.
Paper Mill Misc. Projects
Design and field support for eight 'turnaround' projects
including
• wastewater traveling screen and conveyors,
• new building fans,
• environmental compliance,
• power monitoring,
• medium voltage protective relaying (utility paralleling
reverse current protection).
Projects include modified and
new motor control centers, control system revisions, power
distribution. Work included cost estimating, material
procurement, design and drafting, construction overview and
as-building. Work was completed within an estimated hourly
engineering budget for each project; in support of a
scheduled annual shutdown with short lead times and
intensive scheduling requirements.
Pulp Mill Elemental
Chlorine Free Project
Lighting, Power and Area Classification. Projects included
lighting, backup lighting and hazardous area classification
for pulp mill new bleaching process.
|

Photo courtesy
of Georgia Pacific West
Sulphuric Acid
Plant New Substation
Projects included four substations (12,470V -480V) including
primary switching, transformers and low voltage (480V)
switchgear. Work completed includes design, system
protection coordination, product selection and construction
supervision.
Refinery 3500hp Compressor
Motor
Trouble-shoot existing motor control circuits, including
ancillary services. Review and report on existing control
system for large compressor motor. Recommendations
successfully eliminated nuisance tripping of the machine.
Electrical Standard
Details
Subcontract work includes installation detail review and
revisions, 97 A size details, for code compliance,
consistency with industry standards.
Refinery 2250hp Motor
Overload operation evaluation.
Chemical Plant Turnaround
support
Work includes crane supervision, bidding and connection
design for seven temporary generators, general turnaround
support.
Electricity Forum
Braaksma Engineering sponsored a one day Forum for plant operating staff to discuss solutions for Arc Flash Protection Compliance. Attendees included operating staff from four major refineries, pulp and paper plant, a chemical plant and cogeneration facility. Format included much attendee participation and this event may be repeated as need is expressed.
Previous Individual Experience includes 8 years work completed in the employ of large and medium sized engineering companies, mostly supporting oil refineries in capital expansion projects. Project work completed includes crude and catalytic unit debottlenecking, flare upgrades, sample houses, new effluent plant, heat tracing, lighting and power distribution including substations. Projects supported range in size from small up to $150M t.i.c. |